Skip to navigation Skip to content

Categories

Loading�
Searching...

Products

Loading�
Searching...

Content

Loading�
Searching...
Dominic Lees-Bell

Dominic Lees-Bell

Dominic is our interiors and bathroom expert with a family background in the bathroom industry that has allowed him to build up a raft of knowledge over the years. On an average day you’ll find Dominic leafing through a menagerie of interior design reads, forever in a life-long search for the latest and greatest trends. He looks after our CGI designs here at Drench, often intertwining some of his favourite interiors with our newest products. Ask him on any day his favourite colour and you’ll likely get an answer ranging from burnt orange to a deep, stormy teal. In his spare time you can usually find him musing through a good book, whipping up a fresh brunch or lounging in a sunny pub garden.

Blog Home

Showing 1-15 of 67 results

Back to top